Godina: 2017. Kupac: STSI Integrated technical services Ltd Lokacija: Sisak, Croatia

Ime projekta: Oil Refinery Sisak Opis posla:

Relay protection and switch replacement

Relay protection and switch replacement was carried out according to the Contract, as well as 6 kV line bay in SS 6.
Relay protection was done in two bays of SS 11, 3 bays in SS 7 and Energy facility 2.