Year: 2018. Client: Iskraemeco Ltd Location: Ploče, Croatia

Project name: Bulk Cargo terminal in Port of Ploče harbour Project description:

Equipment delivery and electromechanical works in Port of Ploče bulk cargo terminal

HELB’s work at Port of Ploče included the installation, testing and commissioning of conveyor systems in the new bulk cargo terminal. This facility allows unloading and transfer of metallurgical coal and iron ore from the vessel to the storage space and transport to the station for loading of materials into railway wagons. The capacity of unloading material from ships is 2000 t / h, and the maximum capacity of loading in railway wagons is 2000 t / h for coal and 2400 t / h for iron ore.