Year: 2021. Client: YOUTONE CONSTRUCTION D.O.O. Location: Croatia

Project name: Wind farm Senj Project description:

Electrical installation works, testing, and commissioning

Over the past year, HELB has been working on the largest wind farm in Croatia, located near the City of Senj, which consists of 39 wind turbines built on an area of 65 square kilometers, with a total capacity of 156 MW, and will produce 530 million kWh of electricity annually. At substation Senj, HELB experts were in charge of power transformers installation, laying, connecting, and testing power and signal-control cables, creating relay protection and other studies, MV switchgear functional testing, numerical protection testing, and grounding resistance measuring.